Highest quality standards are achieved through the implementations of latest technology, decades of experience and everlasting moral values , which have helped us to retain our customers as well as multiply them.
NAME OF COMPANY
CONSULTANT NAME
VALUE OF CONTRACT
YEAR OF WORKS
PARTICULERS OF WORKS
Gujarat Ambuja Cement Roper Punjob
Aquatech Industries
12m3 DM PLANT ERECTION COMMISSONING
2005 to 2006
Erection and commissioning of Auto DM plants
Universal
Capsules Limited Dahanu RoadGujarat
Direct
15M3 DM PLANT OVER HAULING
2005 to 2006
Chemical cleaning of all type condenser and AHU
Chembond Chemicals Limited Navi Mumbai
Direct
10 M3 FILTER / SOFTENER
2006
Drinking water plant erection and commissioning
Hindustan Zinc Limited Dariba Mines
TaTa Projects Limited
460 M3 CLARIFIRE AND PREATRAT MENT
2008 to 2009
Preatreatement plant and cooling tower filtration systems
M/S GAVRAV DYENG MILL
DIRECT
2 STREAM SOFTENER SUPLLY 6M3/HOUR
2007/2008
Filter softener for boiler
M/S GAVRAV DYENG MILL
DIRECT
OVER HAULING OF FILTER SOFTENER
2009/2010
Filter softener for boiler
Oberoi tower
Direct
SPAIRE ITEMS SUPPLY
July 2009
SWT
Oberoi mall
Direct
ACF SUPPLY FOR SWT PLANT 16M3
July 2009
Drinking water
Vijay villas Park view
Direct
FILTER SUPPLY FOR SWIMMING POOL
August 2009
Sewing pool
Oberoi mall
Direct
PLANT SUPPLY
July 2009
O&M Contracts per month
Hydro cons
Systems
Direct
ERCTION COMMISONING CONTRACT
September 09
Errection fabrication of WTP
Ankur drugs & pharmaceuticals ltd BADDI
Direct
spare of UV LAMP
November
Spare of uv lamp 39 w light source
BASF LTD TURBHE
DIRECT
supply of spare resin valve/ staner / instrument
November
supply of spare resin valve/ staner / instrument
WILSPUN PALGHAR
DIRECT
SWT PLANT ERECTION /COMMISSIONING
December
Supply Erection commissioning
Khator mill
Direct
SWT plant
December
Supply and commissioning
Thermax India ltd
Direct
drinking water /RO plant erection commission
January
Erection commissioning
IDBI BANK
Direct
STP plant
December
Service of new material
PRABHU SUGAR
THERMAX
20 M3/HOUR RO AND DM PLANT
FEBRUARY
ERECTION COMMISSIONING
IANS SHIVAJI
THERMAX
2 M3/ H RO PLANT FOR DRINKING WATER
FEBRUARY
ERECTION /COMMISSIONING
GAURAV DYENG MIIL
DIRECT
30 M3/H STP PLANT
MARCH
SUPLIED AND ERECTION COMMISSIONING
DIPAK FERTILISER
THERMAX
30 M3/H AUTO DM PLANT
FEBRUARY
ERECTION & COMMISSIONING
ESSAR STEEL
Surat
THERMAX
25 M3/H DRIKING WATER PLANT 2 STEEM
MARCH
ERECTION & COMMISSIONING
OBEROI SPRING
THERMAX
12M3/H RO PLANT
APRIL
ERECTION & COMMISSIONING
VITTHAL DISTERELI (WADI KURD)
THERMAX
150 M3/H FILTER SOFTENER & RO PLANT
APRIL
ERECTION & COMMISSIONING
BOXTER INDIA
AURANGABAD
DIRECT
DM PLANT SPARE
APRIL
SPARE MATERIAL
ONIDA TV
WADA
THERMAX
STP 10 M3/H
APRIL
ERECTION & COMMISSIONING
INTEREGATED
GOREGOAN
DIRECT
FEBRICATION RO PIPING AND SPARE
MARCH
ERECTION & COMMISSIONING
Oberoi spring
Goregoan
Thermax
Erextion & commissioning of r.o. plant
May
12 m3 r,o, plant
JHONSON MATTHEY taloja
THERMAX
Erection & commissioning
May 2010
4 M3 auto DM plant
MSHK seating system Poona
Direct
Erection & commissioning
May
1000 lph softener . plant
OBEROI HIGHT
Goregoan
Direct
Service & spare
May
Swimming pool
Lenxess India pvt.ltd. ankleswer
Thermax
Erection & commissioning
June 2010
75m3 MGF 2 nos.
Essar steel utility
Surat
Thermax
Erection & commissioning
June 2010
150 m3 MM F 2 nos.
DIPAK fertileser
taloja
Thermax
Erection & commissioning
June
20 m3 auto dm plant
ESSR STEEL
Pipe mill surat
Thermax
Erection & commissioning
July 2010
12 m3 SF/MGF/ Drinking plant
Essar steel coating surat
Thermax
Erection & commissioning
July 2010
15m3 softener/ filter
MAHESH Textile
dombivali
Direct
Supply with Erection & commissioning
July 2010
18m3 ETP
MSHK seating system Poona
Direct
Erection & commissioning
July
1000 lph R.O. plant
Vijay vilas thane
Direct
Supply with Erection & commissioning
July 2010
10 m3 SP filter
INCHEM CORPORETION
Direct
Supply with Erection & commissioning
August 2010
10 m3 SP filter
Junagarh power plant
thermax
Erection & commissioning
August 2010
10 m3/h R.O. plant dm/ UF Plant
Amreli power plant
thermax
Erection & commissioning
September 2010
10 m3/h R.O. plant dm/ UF Plant
Technocroft murbad
Thermax
Erection & commissioning
Fabrication /electrical
November 2010
15m3 /h WBA, SOFTENER
Reliance beverage
koperkharane
Thermax
Erection commissioning fabrication operation
December 2010
STP 145m3 per day
HAYAT GOA
DIRECT
SUPPLYEE OF XLL 500
EDI
November 2010
5 m3/h
Thyrocare
Direct
5 m3 R.O. plant opretion contract yearly basis
January 2011
5 m3/hour
ACCUTEST RESEARCH LABORATORIES
Direct
5 m3 DM. plant opretion contract yearly basis
January 2011
5 m3/hour
BASF LIMITED
Turhe navi Mumbai
direct
Supply of DM / Softener resin two ton
January 2011
8 m3 / DM plant
SUPREEM India limited hiranandani
Thermax
E& C 2000 LPH R.O. 6 set in 6 building with hand over
January 2011
2 m3/ hour
Essar steel utility surat
Thermax
Erection & commissioning
September 2010
150m3 softener/ filter
Sheth developers
Prabhadevi
Thermax
Erection & commissioning
Fabrication /electrical
October/November 2010
175m3 STP per day
Supreme it park
Thermax
Erection and commissioning of 2m3/ hour r.o.
February 2011
2 m3 /hour 6 set in 6 tower
Supreem it parks
Thermax
Erection and commissioning of STP
February 2011
100 m3 / day x two
Oberoi construction goregon
Thermax
12 m3 x2 erection and commissioning R.O.
March in running
12 m3 x 2 systems
Oberoi mall goregoan
Thermax
12 m3 R.O. erection and commissioning
March in running
12 m3x 1 R.O. systems
BASF India limited turbhe
Direct
2.5 ton resin supply of DM plant
February 2011
10 m3 dm/35m3 softener
Tcs thane
Direct
20 m3/ h AMC contract for w t p /stp
1 april 11 to 31 march 12
Softener / stp / etp
Senchuri bhawan parel mumbai
Direct
200 m3 / day Operation maintenance contract
1 may 2011 to 30 april 2016
STP
Bewa city virar
Thermax
100 m3 / day Erection & commissioning contract
April 2011
R.O. WTP 15 m3/hour
Bewa city virar
Thermax
150 m3 / day Erection & commissioning contract
MAY 2011
R.O. WTP 10 m3/hour
Bewa city virar
Thermax
200 m3 / day Erection & commissioning contract
MAY 2011
STP. WTP 150 m3/DAY
Rustam ji virar
Direct
500 M3 / day Operation and maintenece contract
May 2011 to 31march 2012
WTP R.O. 5nos.
Intelenet goregoan
Direct
10 M3/ H Operation and maintenece contract
April 2011 to march 2012
WTP , R.O.
ERA ENFRA VIRAR MUMBAI
THERMAX
20 M3 / HErection & commissioning contract
MAY 27-2011
WTP R.O.
INSE SHIVAJI
DIRECT
1 M3/ H Erection & commissioning contract
MAY 5- 2011
WTP , R.O.
Oberoi mall goregaon
Direct
200 m3 / day stp amc
May 2-11 to march 2012
STP
HSBC LIMITED
DIRECT
10M3 /HOURS O&M
1 JUNE 11 TO MARCH 2012
10M3 R.O. ,UF.FILTER
Swayam co-opretive socity limited
Direct
6 m3/ water treatment plant / softener
July 2011
6 m3/ hour
Ultratech cement
Thermax
15 m3/ hour DM plant with UF
December 2011 to January 2012
WTP / DM / UF 15 M3/ hour
ACC CEMENT gadchandur
Thermax
10 m3/ hour DM plant with UF
December 2011 to January 2012
WTP / DM / UF 10 M3/ hour
Katani cement plant
Thermax
15 m3/ hour DM plant with UF
November 2011 to January 2012
WTP / DM / UF 15 M3/ hour
Maruti sujuki
Nagapur
Thermax
SEWAGE TREATMENT
PLANT erection & commissioning
January 2012
25 m3/hour sewage treat plant
Wadhwa developer
Thermax
Operation & maintenance
January 2012 to march 2013
25 m3 Sewage treatment
Jolly board limited
Thermax
15 m3/ hour DM plant with UF
January 2012 February
WTP / DM / UF 15 M3/ hour
TCS YANTRA PARK THane
Direct
Operation & maintenance contract
November 2011 to march 2013
10 m3/ hour x 2 WTP softener
BHAIRAV EXSPORTS textile
Direct
Operation & maintenance contract
January 2012 to march 2013
15 m3/ hour x WTP softener / R.O.
RELAINCE BEVARAGE PARK
DIRECT
Annual maintenance contract
January 2012 to march 2013
150 m3 Per day sewage treatment plant
MAIHER CEMENTS LTD
THERMAX
ERECTION & COMMISSIONING
FABRUARY 2012
20 M3/ HOUR DM PLANT
MGM STEEL LTD
GET WATER
ERECTION & COMMISSIONING
MAY 2012
10 M3/ H R.O. PLANT STP/ETP
JAIPUR INTERECROFT
GET WATER
ERECTION & COMMISSIONING
MAY 2012
20 M3/H ETP/STP/R.O.
PRITHAVI FERROW
THERMAX
ERECTION & COMMISSIONING
APRIL 2012
30 M3/H DM/ R.O. PLANT
RELAINCE HOSPITAL
THERMAX
ERECTION & COMMISSIONING
MAY 2012
1100 MLD STP PLANT
RELAINCE HOPITAL CHARNI ROAD
THERMAX
ERECTION & COMMISSIONING
MAY 2012
15 0m3/ day STP x WTP / R.O.
THERMAX CHEMICAL
THERMAX
ERECTION & COMMISSIONING
JUNE 2012
15 m3/ hour x WTP DM softener / R.O.
JAIPURTECXCROPT
GET WATER
ERECTION & COMMISSIONING
MAY 2012
200 m3/STP x WTP
JAIPUR TEXCROPT
GET WATER
ERECTION & COMMISSIONING
JUNE
15 M3/HOUR R.O. PLANT
MGM ISPAT ANGUL KATAK
GET WATER
ERECTION & COMMISSIONING
JULY
20 M3/H WTP DM PLANT
KALPATARU
DIRECT
ERECTION & COMMISSIONING
JULY
5 M3/H WTP PLANT
ACG CAPSUL KANDIWALI
DIRECT
AMC CONTRACT
MAY TO APRIL 2013
5 M3/H DM PLANT
ACG CAPSUL DAHANU
DIRECT
AMC CONTRACT
MAY TO APRIL 2013
10 M3/H ETP /STP PLANT
BHARAT SRIRAM THANE
DIRECT
AMC CONTRECT
JULY 2012
3 M3/H R.O. EDI
JAIPUR TEXCROPT
GET WATER
ERECTION & COMMISSIONING
JULY 2012
15 M3/HOUR R.O. PLANT
ASIAN COLER CODE
THERMAX
ERECTION & COMMISSIONING
AUGUST 2012
15M3/ H DM PLANT
ASIAN COLLER CODE
THERMAX
ERCTION & COMMISSIONING
AUGUST 2012
55 M3/H WTP SYSTEMS
ASIAN COLLER CODE
THERMAX
ERCTION & COMMISSIONING
AUGUST 2012
30 M3/H SOFYENER
ASIAN COLLER CODE
THERMAX
ERCTION & COMMISSIONING
AUGUST 2012
5 M3/H DRINKING WATER PLANT
UPL ANKLESWER /JAGADIA
THERMAX
ERCTION & COMMISSIONING
SEPTEMBER 2012
15 M3/H AUTO DM PLANT
SRF LIMITED DAHEJ BHARUCH
THERMAX
ERCTION & COMMISSIONING
SEPTEMBER 2012
20 M3/H R.O. PLANT
GMT NAGPUR
THERMAX
ERCTION & COMMISSIONING
SEPTEMBER 2012
10 M3/H DM PLANT
KALPATARU COURT
DIRECT
NEW PLANT SUPPLY
SEPTEMBER 2012
5 M3/H DRINKING WATER PLANT
GLOBE INDUSTRIES
DIRECT
SPAERE S
SEPTEMBER 2012
R.O. PURIFIRE SYSTEMS
UPL LIMITED
THERMAX
Erection & commissioning of auto DM plant
October 2012
DM PLANT AUTO
OBEROI SCHOOL GOREGOAN
DIRECT
100 M3/ DAY STP PLANT maintenance and modification
November 2012
100 m3/ day STP
Oberoi sky height lokhand wala andheri west
Direct
100 meter x 50 meter swimming pool with filter
January 2013 to December 2013
Operation & maintenance contract
ENMASH GB power udisha
Thermax
15 m3 dm plant with wtp systems
January 2013
Erection & commissioning
MGM ISPAT ANGUL URISSA
GET WATER
15 M3 DM plant 20M3 R.O. plant
December 2012
Erection and commissioning
Mahendra & mahendra tractor plant mohali
Direct
2500 meter upvc pipe supplied with erection
February 2013
Erection & commissioning
Reliance beverage parks koperkhairane
Direct
100 M3/PER DAY STP PLANT
February 20-13
Annual maintenance contract yearly
Reliance chhuna bathhi
Direct
Swim mining pool filter 20 m3/hour
March 2013
Overhauling
Adlob intertentment poli road khapoli
Thermax
50 m3/hour water treatment plant with clarify faculetor
March 2013
Erection & commissioning
Birla cements satna MP
Thermax
Consultancy of wtp with dm
March 2013
Modification wtp plant
HSBC BANK malad
Direct
300 meter 3” GI pipe supplied with fabrication
February 2013
Erection & commissioning
Oberoi contruction andheri
Jaldhara water
150 m3/per day
February 2013
Erection & commissioning
Swaraj tractor factory jaheerabad hydrabad
GET WATER
4 m3/h fully auto DM plant
March 2013
Erection & commissioning
Adlob intertentment poli road khapoli
Thermax
50 m3/hour water treatment plant with clarify faculetor
March 2013
Erection & commissioning
Birla cements satna MP
Thermax
Consultancy of wtp with dm
March 2013
Modification wtp plant
HSBC BANK Malad
Direct
300 meter 3” GI pipe supplied with fabrication
February 2013
Erection & commissioning
Oberoi construction Andheri
Jaldhara water
150 m3/per day
February 2013
Erection & commissioning
Swaraj tractor factory jaheerabad Hydrabad
GET WATER
4 m3/h fully auto DM plant
March 2013
Erection & commissioning
Adani power plant
Thermax
10 m3/h R.O. plant
April 2013
Erection commissioning
Reliance industries
Direct
150 m3/day stp plant
May 2013
Material with commissioning
Oberoi sky height
direct
30m3 aria swimming pool
May 2013
Operation and maintenance contract
Srium pharma pune
Thermax
30 m3/h drinking water plant with uf
June 2013
Erection & commissioning
Thermax india limited Pune
thermax
100 m3/day stp plant
July 2013
Erection & commissioning
Nisco /sirco
Direct
100 m3/day stp plant
July 2013
Operation & maintenance cont.
Rustomji globle city Virar
Direct
4 m3/hour r.o. plant with dosing systems
July 2013
Material /with commissioning
Sirwal thermax boiler division
Thermax
150 m3 per day sewage treatment plant
July 2013
Erection & commissioning
Sirwal thermax boiler division
Thermax
200 m3 per day effluent treatment plant
July 2013
Erection & commissioning
Hinduja hospital
Direct
15m3/hour water treatment plant
July 2013
Overhauling & commissioning
Perrigo Lab Ambernath
Direct
15 m3/hr PW GEN plant
March 2014
Operation & Maintenance
Serco global service
Direct
25 m3/h stp plant
April 2014
Operation & Maintenance
Acc CEMENTS ltd
Thermax
75 m3/h wtp
April 2014
Erection with commissioning
Acc cements LTD
Thermax
10 M3/H R.O. plant
April 2014
Erection with commission
MANIK GARH CEMENT
Thermax
150m3/day etp
May 2014
Erection with commission
Serco global service
direct
25m3/hour stp
May 2014
New plant
Jll ( hsbc)
Direct
15 m3/ h wtp
June 2014
Operation & Maintenance
Jsw mundra Gujarat
Thermax
100m3/h wtp
June 2014
Erection with commissioning
Jsw mundra Gujarat
Thermax
150m3/day etp
June 2014
Erection with commissioning
Datt sugar karkhana kolhapur
Aqua design
75m3/h wtp dm
July 2014
Erection with commissioning
Honda motor cycle
Thermax
100m3/h wtp
July 2014
Erection with commissioning
Honda motorcycle
Thermax
150m3/h etp
July 2014
Erection with commissioning
Maruti sujuki Nagpur
Thermax
200m3/day stp
July 2014
Erection with commissioning
Nirlon limited
Upl
750 kld stp plant
August 2014
Erection with commissioning
Ambuja cements limited
Direct
1 ton resin
September 14
Resin supply of dm plant
Mittal file
Direct
Amc of r.o. plant
September 14
Annual maintenance contract
Billosh industries
Thermax
150 m3/wtp
Sept. 14
Painting works at site
Reliance industries ltd
Direct
150 m3/h stp
Sept 14
Overhauling with material supplied filter mgf 10 nos.
Rustomji ever shine global city
direct
800 MLD per day
Sept. 14
Chemical supply monthly
500 kg
ACC cements limited
direct
10m3 R.O. plant
Oct14.
Spare material supply
Nirlon Limited
UPL
350 MLD STP plant
Oct -14
E&C of sewage treatments plant
MITTAL File
Direct
1000 LPH R.O. plant
Oct.-14
Modification of plant
ACC charchgate
Direct
75 m3 /day STP
Nov -14
Modification and AMC of stp plant
Siddivinayak Cements Pali
Thermax
80m3 h R.O. PLANT
January , 2015
E& C of water treatments plant
ADLUB Intertentments
Direct
50 m3/ h WTP
Decmber - 14
AMC
JSW sow paper mill
Thermax
150 m2/ h R.O. PLANT
January -15
E&C of water treatments plant
Mittal files limited
Direct
1500 LPH R.O. Plant
January 15
Supply E&C
* To embrace new technologies and methods. * To give unsurpassed products and services to the clients. * To constantly look for improvement and changes.